 Rank: Advanced Member
Groups: extranet\Forum
Joined: 4/25/2016(UTC) Posts: 20
|
Hi.
I have alot of reports where i'm using a amount measure, which i would like to change to amount rep measure.
Is this possible to do, without lossing all the criterias and calculations made to the report?
Thanks!
|
|
|
|
|
|
 Rank: Administration
Groups: extranet\Forum
Joined: 4/7/2011(UTC) Posts: 508
|
Hi Tim,
You can do it one object at a time. Go to Define mode. In the Source data tab, drag the new measure and place it on top of the already selected measure, also in the Source data tab. This will replace the measure without breaking any calculations.
Alternatively, if you have many reports, locate the physical files on your TARGIT server. Open these files in e.g Notepad and do a Search and Replace. Of course, take a backup of the original files before you do this.
BR / Ole |
Ole Dyring |
|
|
|
|
|
 Rank: Advanced Member
Groups: extranet\Forum
Joined: 4/25/2016(UTC) Posts: 20
|
Hi Ole.
Thanks alot!! That's a life saver :D
BR Tim
|
|
|
|
|
|
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.